Skip to content
MissionChief UK Operational Field Guide
Guide online TKB Games

Buildings and Extensions Database

The production infrastructure database contains 18 schema-controlled records used by verified mission preconditions.

data/uk/infrastructure/
Canonical IDNameKindVerified mission effect
bomb_disposal_hqBomb Disposal HQBuildingBomb Disposal generation
bomb_disposal_marine_unit_extensionBomb Disposal Marine Unit ExtensionExtensionCoastal Bomb Disposal generation
hart_baseHART BaseBuildingHART-dependent generation
aviation_firefighting_extensionAviation firefighting ExtensionExtensionAirport-firefighting generation
airfield_operations_extensionAirfield Operations ExtensionExtensionAirfield-operations generation
mass_casualty_extensionMass Casualty ExtensionExtensionMass-casualty generation
recovery_centreRecovery CentreBuildingRecovery missions and variations
hgv_recovery_extensionHGV Recovery ExtensionExtensionHeavy-vehicle recovery variations
railway_policeRailway PoliceBuildingRailway Police generation
railway_fire_responseRailway fire responseBuildingSpecialist rail-fire generation
police_helicopter_stationPolice Helicopter StationBuildingPolice air-support generation
police_public_order_extensionPolice Public Order ExtensionExtensionPublic-order generation
foam_extensionFoam ExtensionExtensionFoam-dependent generation
water_damage_pump_extensionWater Damage Pump ExtensionExtensionHigh-volume pumping generation
flood_rescue_extensionFlood Rescue ExtensionExtensionFlood-rescue generation
technical_rescue_extensionTechnical Rescue ExtensionExtensionTechnical-rescue generation
mud_decontamination_extensionMud Decontamination ExtensionExtensionMud-rescue generation
hovercraft_extensionHovercraft ExtensionExtensionHovercraft-dependent generation

Mapped mission fields are validated against these canonical IDs. A mission fails validation when it claims a countable specialist precondition without a matching infrastructure record.

Infrastructure is not a dispatched resource

Section titled “Infrastructure is not a dispatched resource”

A generation precondition does not automatically prove:

  • that a vehicle from the building must attend;
  • the building’s vehicle capacity;
  • staffing or classroom capacity;
  • purchase price or construction duration;
  • whether an extension is active by default.

Examples:

  • Mass Casualty Extension is separate from Mass Casualty Equipment.
  • Recovery Centre is separate from the number of assets to tow.
  • Airfield Operations Extension is separate from Airfield Operations Vehicles.
  • Active Drone counts are generation state, not automatically a Drone dispatch row.

A verified infrastructure record applies only to populated fields. The current catalogue strongly covers identity and mission-generation relationships; many costs, construction times, capacities and parent-building relationships remain controlled evidence targets.

See Specialist Infrastructure Batch 2 for the Stage 22 expansion.